Author | |
Date and time | 2014-07-07 21:48:57.7 UTC |
Latitude | 35.675 |
Longitude | 75.205 |
Depth | 10 |
Magnitude | 4.4 mb |
Region | NORTHWESTERN KASHMIR |
Latest update | 2016-04-19 07:24:52.9 UTC |
rms | 0.93 s |
N° phases used for the localisation | 40 |
N° stations used for the localisation | 40 |
Gap | 89.0 ° |
95% confidence ellipse | |
semi major | 9 |
semi minor | 6.9 |
Azimuth | 62 ° |
Location Type | manual |
Download data for this event
Note: links can take up to 20 minutes from the earthquake to become available
Operating network | code | Distance° | EvAz | A/M | Phase | Pick time | Residual | T | Reporting network |
---|---|---|---|---|---|---|---|---|---|
NIL | 2.580 | 219 | M | P | 2014-07-07 21:49:40.4 | 0.8 | T | GFZ | |
KBL | 5.180 | 259 | M | P | 2014-07-07 21:50:15.8 | 0.3 | T | GFZ | |
AAK | 6.980 | 356 | M | P | 2014-07-07 21:50:42.7 | 2.5 | T | GFZ | |
KK31 | 8.260 | 335 | M | P | 2014-07-07 21:50:58.0 | 0.4 | T | NNC | |
KK31 | 8.260 | 335 | M | S | 2014-07-07 21:52:32.0 | 1.1 | T | NNC | |
KKAR | 8.260 | 335 | M | P | 2014-07-07 21:50:58.8 | 1.2 | T | GFZ | |
MAKZ | 12.230 | 23 | M | P | 2014-07-07 21:51:54.1 | 2.2 | T | GFZ | |
OTUK | 12.740 | 351 | M | P | 2014-07-07 21:51:59.0 | 0.1 | T | NNC | |
KURK | 15.240 | 8 | M | P | 2014-07-07 21:52:36.0 | -1.8 | T | NNC | |
BVAR | 17.680 | 350 | M | P | 2014-07-07 21:53:05.0 | 0.1 | T | NNC | |
BRVK | 17.720 | 350 | M | P | 2014-07-07 21:53:06.5 | 1.1 | T | GFZ | |
AKTO | 19.300 | 325 | M | P | 2014-07-07 21:53:21.0 | -1.8 | T | NNC | |
ARU | 23.630 | 337 | M | P | 2014-07-07 21:54:08.7 | -0.5 | T | GFZ | |
HAKT | 25.290 | 284 | M | P | 2014-07-07 21:54:25.7 | 1.1 | T | GFZ | |
CHTO | 26.860 | 122 | M | P | 2014-07-07 21:54:38.5 | 0 | T | GFZ | |
CMMT | 26.870 | 122 | M | P | 2014-07-07 21:54:38.4 | -0.2 | T | GFZ | |
SLVN | 28.860 | 112 | M | P | 2014-07-07 21:54:56.0 | -0.4 | T | GFZ | |
PBKT | 29.800 | 123 | M | P | 2014-07-07 21:55:04.9 | 0.2 | T | GFZ | |
CSS | 33.990 | 281 | M | P | 2014-07-07 21:55:42.6 | 1.1 | T | GFZ | |
TESR | 37.620 | 302 | M | P | 2014-07-07 21:56:12.7 | 0 | T | GFZ | |
PLOR1 | 37.640 | 301 | M | P | 2014-07-07 21:56:13.8 | 0.9 | T | GFZ | |
MLR | 38.150 | 300 | M | P | 2014-07-07 21:56:17.6 | 0.4 | T | GFZ | |
ARR | 39.070 | 300 | M | P | 2014-07-07 21:56:24.6 | -0.4 | T | GFZ | |
IPM | 39.130 | 137 | M | P | 2014-07-07 21:56:25.9 | 0.6 | T | GFZ | |
LVZ | 39.510 | 337 | M | P | 2014-07-07 21:56:27.9 | -0.7 | T | GFZ | |
ARBE | 39.570 | 323 | M | P | 2014-07-07 21:56:28.1 | -0.9 | T | GFZ | |
KWP | 40.230 | 307 | M | P | 2014-07-07 21:56:34.9 | 0.3 | T | GFZ | |
TRPA | 40.370 | 305 | M | P | 2014-07-07 21:56:35.8 | 0.1 | T | GFZ | |
SUF | 40.430 | 328 | M | P | 2014-07-07 21:56:35.0 | -1.2 | T | GFZ | |
MSF | 40.460 | 333 | M | P | 2014-07-07 21:56:35.2 | -1.2 | T | GFZ | |
MTSE | 40.500 | 321 | M | P | 2014-07-07 21:56:36.0 | -0.7 | T | GFZ | |
OUL | 41.340 | 331 | M | P | 2014-07-07 21:56:43.0 | -0.6 | T | GFZ | |
RNF | 41.860 | 333 | M | P | 2014-07-07 21:56:47.5 | -0.4 | T | GFZ | |
RAF | 41.990 | 324 | M | P | 2014-07-07 21:56:48.0 | -0.9 | T | GFZ | |
SGF | 42.010 | 334 | M | P | 2014-07-07 21:56:48.6 | -0.5 | T | GFZ | |
VAF | 42.050 | 327 | M | P | 2014-07-07 21:56:49.1 | -0.4 | T | GFZ | |
KEV | 42.850 | 338 | M | P | 2014-07-07 21:56:55.6 | -0.3 | T | GFZ | |
ARE0 | 43.220 | 337 | M | P | 2014-07-07 21:56:58.7 | -0.3 | T | GFZ | |
HEF | 43.380 | 335 | M | P | 2014-07-07 21:56:59.8 | -0.5 | T | GFZ | |
TIXI | 45.290 | 21 | M | P | 2014-07-07 21:57:15.5 | 0 | T | GFZ |