Author | |
Date and time | 2019-06-30 14:26:33.1 UTC |
Latitude | 13.444 |
Longitude | 40.971 |
Depth | 10 |
Magnitude | 4.4 mb |
Region | ETHIOPIA |
Latest update | 2019-06-30 14:36:59.6 UTC |
rms | 1.39 s |
N° phases used for the localisation | 41 |
N° stations used for the localisation | 41 |
Gap | 85.0 ° |
95% confidence ellipse | |
semi major | 16.7 |
semi minor | 14.3 |
Azimuth | 28 ° |
Location Type | manual |
Download data for this event
Note: links can take up to 20 minutes from the earthquake to become available
Operating network | code | Distance° | EvAz | A/M | Phase | Pick time | Residual | T | Reporting network |
---|---|---|---|---|---|---|---|---|---|
ATD | 2.640 | 136 | A | P | 2019-06-30 14:27:15.9 | 0 | T | GFZ | |
LODK | 11.410 | 210 | A | P | 2019-06-30 14:29:16.0 | 0 | T | GFZ | |
UOSS | 18.380 | 49 | A | P | 2019-06-30 14:30:48.5 | 0.6 | T | GFZ | |
VRI | 34.500 | 342 | A | P | 2019-06-30 14:33:23.4 | 2.1 | T | GFZ | |
PLOR1 | 34.510 | 342 | A | P | 2019-06-30 14:33:24.8 | 3.3 | T | GFZ | |
VOIR | 34.640 | 340 | A | P | 2019-06-30 14:33:22.8 | 0.2 | T | GFZ | |
TAM | 34.900 | 291 | A | P | 2019-06-30 14:33:24.0 | -0.7 | T | GFZ | |
GEZN | 34.930 | 38 | A | P | 2019-06-30 14:33:22.1 | -3 | T | GFZ | |
NIL | 35.580 | 50 | A | P | 2019-06-30 14:33:29.5 | -1 | T | GFZ | |
AKBB | 38.370 | 348 | M | P | 2019-06-30 14:33:52.5 | -1.9 | T | GSRC | |
PSZ | 38.600 | 337 | A | P | 2019-06-30 14:33:57.7 | 1.3 | T | GFZ | |
MPLH | 38.930 | 334 | A | P | 2019-06-30 14:34:00.2 | 1.1 | T | GFZ | |
VYHS | 39.480 | 337 | A | P | 2019-06-30 14:34:04.7 | 1.1 | T | GFZ | |
OBKA | 39.760 | 331 | A | P | 2019-06-30 14:34:07.5 | 1.4 | T | GFZ | |
ARSA | 39.870 | 333 | A | P | 2019-06-30 14:34:07.3 | 0.4 | T | GFZ | |
DRE | 39.950 | 330 | A | P | 2019-06-30 14:34:08.9 | 1.3 | T | GFZ | |
ZOU2 | 40.550 | 330 | A | P | 2019-06-30 14:34:13.2 | 0.5 | T | GFZ | |
MOA | 40.880 | 333 | A | P | 2019-06-30 14:34:15.3 | 0 | T | GFZ | |
KRUC | 40.900 | 335 | A | P | 2019-06-30 14:34:14.6 | -0.8 | T | GFZ | |
VRAC | 41.010 | 336 | A | P | 2019-06-30 14:34:17.4 | 1.1 | T | GFZ | |
AAK | 41.040 | 38 | M | P | 2019-06-30 14:34:18.3 | 1.6 | T | GSRC | |
OBN | 41.720 | 356 | M | P | 2019-06-30 14:34:18.8 | -3.4 | T | GSRC | |
GEC2 | 41.870 | 333 | A | P | 2019-06-30 14:34:20.5 | -3 | T | GFZ | |
DPC | 41.940 | 337 | A | P | 2019-06-30 14:34:22.5 | -1.6 | T | GFZ | |
KHC | 42.140 | 333 | A | P | 2019-06-30 14:34:24.7 | -0.9 | T | GFZ | |
WET | 42.460 | 333 | A | P | 2019-06-30 14:34:28.3 | 0.1 | T | GFZ | |
DAVA | 42.580 | 329 | A | P | 2019-06-30 14:34:28.1 | -1.3 | T | GFZ | |
GRC2 | 42.940 | 331 | A | P | 2019-06-30 14:34:31.5 | -0.6 | T | GFZ | |
TANN | 43.580 | 334 | A | P | 2019-06-30 14:34:37.3 | 0 | T | GFZ | |
ARTI | 44.900 | 14 | M | P | 2019-06-30 14:34:46.4 | -1.5 | T | GSRC | |
BRVK | 45.880 | 24 | M | P | 2019-06-30 14:34:55.6 | 0 | T | GSRC | |
VSU | 46.190 | 350 | M | P | 2019-06-30 14:34:56.9 | -1.2 | T | GSRC | |
ATE | 46.410 | 318 | A | P | 2019-06-30 14:35:00.2 | 0.4 | T | GFZ | |
MAKZ | 47.770 | 38 | A | P | 2019-06-30 14:35:11.3 | 0.9 | T | GFZ | |
MK31 | 47.950 | 38 | M | P | 2019-06-30 14:35:12.4 | 0.6 | T | GSRC | |
MKAR | 47.950 | 38 | M | P | 2019-06-30 14:35:12.5 | 0.7 | T | GSRC | |
KURK | 48.090 | 31 | A | P | 2019-06-30 14:35:14.1 | 1.2 | T | GFZ | |
ZALV | 53.050 | 31 | M | P | 2019-06-30 14:35:50.2 | -0.2 | T | GSRC | |
NRIK | 62.980 | 17 | M | P | 2019-06-30 14:37:01.3 | 1.1 | T | GSRC | |
YAK | 77.610 | 29 | M | P | 2019-06-30 14:38:29.3 | -0.4 | T | GSRC | |
BILL | 89.780 | 18 | M | P | 2019-06-30 14:39:32.9 | 0.7 | T | GSRC |